Which pieces work for an upper factory floor?
UpdatedFor a usable upper factory floor in Moon Sweepers, start with foundation pieces rather than assuming every piece called a floor will accept machines. Jeiji and Jacob independently report successful elevated foundation floors in their November 23–24 Steam replies. Their supports and positioning differ. This guide isolates their shared result and the official placement controls, without prescribing one universal tower height.
The shared result and the remaining disagreement
Jeiji reports a two-storey factory with a roof carrying solar panels, using an elevated foundation as the start of the working floor. Jacob also reports extending upper foundation sections and placing factory equipment below a higher level. Both installed builds are unstated; their posts fall after the 1.0.6 release. These are attributed player-tested reports, not construction tests performed by our site.
In the same thread, Nuggs describes overlap and alignment failures, while Lord Skarra remains dissatisfied and says foundations are the only useful floor option. The successful reports therefore establish that upper foundation floors can work in those cases. They do not establish that every wall, floor or platform combination snaps into a continuous building.
Choose the working surface before filling the floor
Separate the surface that must support your machines from pieces used mainly to reach it or enclose it. For this task, the common evidence concerns the foundation surface. Before copying a large factory, test one elevated foundation area with the equipment you intend to place there. Keep the test small enough to inspect its edges and the building preview.
The 1.0.5 developer notes explain building on, under and beside foundations and extending past an edge. The 1.0.6 notes add clearer previews and reasons for rejected placement at the top centre of the screen. Use those actual messages to distinguish an unsupported placement from an obstructed position; the word floor alone does not tell you which requirement has failed.
Use the documented controls for the small test
Aim at the appropriate face or edge of an existing foundation when extending it, using the official on/under/beside behaviour. If the snapped position is unsuitable, F switches to free placement. With the building tool active in 1.0.6, arrow keys nudge a held piece by 0.5 m per press, up to 4 m, and Enter places it. Read the highlighted SNAP or FREE mode before confirming.
The two successful players use different ways to obtain their initial elevation, so we do not combine their measurements into a single recipe. Their common checkpoint is an upper foundation surface that accepts the intended work. Continue outward only after your small test is usable, and leave a way to get back to the surface while checking it.
Expand in sections and check the actual route
After the first section works, inspect the next join before replicating it across a long span. Jacob describes alignment drifting on longer connections; Jeiji also reports snapping difficulties. These observations give a reason to validate successive sections, rather than assuming one correct joint proves an entire building will align. Their posts do not provide a universal span or spacing rule.
Access and material delivery are separate checks. Walk the route you plan to use and follow a test load through any belt that serves the upper level. The official 1.0.6 belt rules allow routes over ramps, stairs and platforms, but a permitted belt shape does not itself prove that your destination machine is supplied. Use the existing belt and bottleneck guides for that part.
When the preview still refuses the piece
Record the selected piece, its target surface, placement mode and the displayed rejection reason. If the first small working surface fails, stop expanding that attempt and compare those details with the sources. Repeating a long row of the same rejected join will not identify which condition is wrong.
The 1.0.5 notes document Move Mode with the building tool: R picks up a piece together with what stands on it, right-click puts it back, and R or Escape exits. Inspect what is attached before rearranging an occupied floor. This documented recovery control is different from a promise that relocating a complete multilevel factory preserves every connection.
What success looks like
An upper foundation section accepts the intended equipment, remains reachable and has a tested delivery route before you copy it across the planned floor.